Sun Plaza Spring
Sun Plaza Spring was offered in the Aug 2022 BTO exercise. It is completed. No flat in it has resold often enough for us to rate a block yet.
What it is and when it launched
- Town
- Tampines
- Offered in
- Aug 2022 (22AUGBTO)
Source: HDB sales brochure, Aug 2022 (PDF, hdb.gov.sg).
Where it is
© contributors | Singapore Land Authority- Nearest MRT
- Tampines East · 710 m in a straight line · about 12 min walk (estimated)
We have not measured the walking route; the estimate is a straight line.
Schools within 1 km
- Primary schools within 1 km
- 4 · Chongzheng Primary School, Gongshang Primary School, Tampines North Primary School, Yumin Primary School
- Most-sought P1 school
- Gongshang Primary School · 2025 Phase 2C 2.7× subscribed
What a resale flat costs nearby today
The rated HDB blocks nearest Sun Plaza Spring, with the 12-month median resale price for each flat type this project offers. A block with no resale of that type shows no figure rather than a substitute one.
Swipe the table sideways to see every column.
| # | Block | Distance | 4-room median · 12 mo | 5-room median · 12 mo | Block rating |
|---|---|---|---|---|---|
| 1 | Blk 400B Tampines St 41 | 20 m | none in 12 mo | none in 12 mo | B |
| 2 | Blk 400A Tampines St 41 | 50 m | none in 12 mo | none in 12 mo | B |
| 3 | Blk 400C Tampines St 41 | 60 m | none in 12 mo | none in 12 mo | A |
| 4 | Blk 428 Tampines St 41 | 70 m | none in 12 mo | none in 12 mo | C |
| 5 | Blk 429 Tampines St 41 | 100 m | none in 12 mo | none in 12 mo | C |
| 6 | Blk 425 Tampines St 41 | 120 m | S$550,000 · 1 resale | S$675,000 · 1 resale | D |
| 7 | Blk 427 Tampines St 41 | 140 m | none in 12 mo | none in 12 mo | D |
| 8 | Blk 424 Tampines St 41 | 140 m | S$670,000 · 1 resale | none in 12 mo | C |
The A–E letter rates that block on its own resale record, within HDB — it is not a reading of Sun Plaza Spring, which we do not rate yet.
The flats
- Flats
- 267
- Blocks
- 3
- Flat types
- 4-room and 5-room
When you can sell it
A new HDB flat carries a minimum occupation period (MOP) — five years for most flats, counted from the day the keys are collected, not from the day it was booked or built. Until that period is up the flat cannot be sold on the resale market, rented out whole, or used to buy private property.
HDB has not published a completion date for Sun Plaza Spring, so we do not print one, and we do not calculate when the period ends. HDB writes to each household with the date that applies to them.
PriceVero is an independent information page. We are not the developer, the marketing agent or HDB, and we do not sell or market this project. The facts here come from public sources named on this page and were last checked on 06-10-2026; launch dates, prices and unit counts can change, so confirm with the developer or HDB before relying on them. Nearby resale figures are medians from public transaction records, not a valuation of this project.
Source: HDB's BTO sales brochures, retrieved on 10 September 2026 from https://www.hdb.gov.sg/. Facts are reproduced with credit; no licence to the document itself is claimed and none is implied.
Is this flat priced low, in line, or high? Name any HDB block and the price you are weighing. We check it against what flats in that block have actually resold for — the walk to the station, the schools and the remaining lease included.
Free — sign in and the rating is on the screen. Want the longer form, with floor, size and the stamp duty? Open the price check. Holding a listing link instead? Paste it here. Not a valuation — a reading of a price against the evidence.
Frequently asked
When was Sun Plaza Spring launched?
Sun Plaza Spring was offered in the Aug 2022 BTO sales exercise in Tampines.
How big is Sun Plaza Spring?
Sun Plaza Spring is planned as 267 flats and 3 blocks. The flat types offered are 4-room and 5-room.
How far is Sun Plaza Spring from an MRT station?
The nearest station is Tampines East MRT, about 710 m from Sun Plaza Spring in a straight line. We have not measured the walking route, so we estimate it at a 12-minute walk; the real one can only be longer.
When can a flat at Sun Plaza Spring be sold?
After the minimum occupation period: five years for most flats, counted from key collection. HDB has not published a completion date for Sun Plaza Spring, so we do not print one and we do not work out when the period ends.
What does a resale flat near Sun Plaza Spring cost?
The table on this page has the 12-month median resale price for each flat type in the nearest rated blocks; a blank means no resale of that type.
Does PriceVero rate Sun Plaza Spring?
Not yet. Its blocks get ratings once they are completed and resold, and this page will link them.